JNV Mirzapur

(Ministry of HRD,Dept Of Education,Government of India)

CBSE Affiliation Number:

Current Time :

  
 :  23-08-2017

Construction Activities

 

STATUS OF INFRASTRUCTURE IN JNV’S

 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

 

 

:23.17 acres

 

:yes

 

 

:1987

 

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

 

 

: Completed

 

yes

 

iii

Permanent buildings constructed

 

 

: CBRI pattern

 

iv

School building

 

 

 

: Complete

 

v

Dormitories

:  Boys ______________ Nos.

   with Warden Residence__2____ Nos.

 

 

 

 

:  Girls ______________ Nos.

   with Warden Residence____2__ Nos.

 

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

 

 

:  Complete , Area ______

 

vii

Principal Residence

 

 

:  1 No.

 

viii

Staff Quarters

 

 

 

 

: Type III = 28 Nos.

  Type II = 2 Nos.

  Type  I  = 01Nos.

  SP Sheds converted into Staff Qrs.:1 Nos.

 

ix

M.P. Hall

 

: Available

x

Workshop

 

: Available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

 

: Shaft type / Column based

 

:  _______ litres

 

: Working satisfactory / not satisfactory

xii

U.G. tank

 

Its capacity

 

Present Status

 

 

:  _______ litres

 

: Working satisfactory / not satisfactory

xiii

D.G. Set

 

 

 

 

:  Available

: _____________ make

:   25 KV

: Working

: Year of procurement

 

xiv

Sewage Pump

 

: ________ H.P.

xv

Water Pump

 

 

: ________ capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 

 :  Urban Feeder

:  Complete/ Incomplete

: __________ Nos. of Poles

 

: 6 hrs.

  

xvii

Playfields

 

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 

 

: Available

:  _______Nos.   – Available / not available

:  _______Nos.   – Available / not available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

: Potable,  ______ Nos.-  working / not working

: Potable, ______ Nos.-  working / not working

:  ______ hours supply in a day

xix

Rajiv Gandhi Smriti Van

 

:  Available

xx

Fire fighting arrangement

 

:  Working

xxi

Last date of cleaning of

(a)   Septic tank

(b)   Water tanks

 

:

:

xxii

Whether area around transformer is fenced

:  Yes  /  No

xxiii

Whether open wells, if any, are covered from top

:   Yes / No

xxiv

Works taken up under M&R fund during current year and last year:-

 

:

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

 

 

 

 

           

 

 

Details of vehicle provided to the Vidyalaya

(i)

Whether vehicle is provided or not (Yes/No)

 

 

(ii)

Description to vehicle.

 

 

(iii)

Model no and date of purchase.

 

 

(iv)

Present condition of the Vehicle.

 

 

 

 

Our Location